| # | Название | Дата премьеры | Хронометраж |
|---|---|---|---|
| 4 | Vermont Farmhouse: Framing and Wiring for the Future Framing continues, while in the basement installers put in special wiring to make this farmhouse a "connected home". Also: a tour of NASA's Johnson Space Center in Houston, Texas. |
2001-09-24 | — |
| 5 | Vermont Farmhouse: Exterior Update Metal roofing installation is underway, and the redwood deck is constructed. Included: trimwork on the porch and lessons in farming. |
2001-10-01 | — |
| 7 | Vermont Farmhouse: Exterior Painting and Kitchen Cabinet Installation Painting has begun on the exterior, while custom cabinets are installed in the kitchen. Also: a tour of Crown Point factory in Claremont, NH. |
2001-10-15 | — |
| 8 | Vermont Farmhouse: Finish Trim and Cabinet Installation Trim work is completed in the living room and the fireplace is installed. A window and vanity are added to the master bath. |
2001-10-22 | — |
| 9 | Vermont Farmhouse: Stone Wall Construction and Covered Bridges Exterior work continues with construction of a new stone wall. Inside the farmhouse, a staircase is built. Also: a look at the heritage of covered bridges in VT. |
2001-10-29 | — |
| 10 | Vermont Farmhouse: Connected Home Update and Garage Doors Work continues in the garage, while home automation solutions are explored inside the residence. |
2001-11-05 | — |
| 11 | Vermont Farmhouse: Kitchen Update and Bathroom Tile Installation Bob Vila catches up on progress in the home's kitchen, where new appliances have been installed. In the bathroom, tile is applied. |
2001-11-12 | — |
| 12 | Vermont Farmhouse: Home Entertainment and Carpet Installation Landscape work begins; inside, carpet is laid down and a new entertainment center is installed. Special appearance: model and designer Kathy Ireland. |
2001-11-19 | — |
| 13 | Vermont Farmhouse: Project Completion Bob Vila takes a final tour of the completed farmhouse project, paying special attention to the landscaping, home automation features, and interior design. |
2001-11-26 | — |
| 14 | Victorian Restoration: Initial Tour This ambitious restoration project involves renovating a Victorian home as well as a former dairy barn also on the property. |
2001-12-03 | — |
| 15 | Victorian Restoration: Exploring the Barn and Demolition Bob Vila focuses on the barn, a former dairy storage building that will be converted into an artist's studio and office space. |
2001-12-10 | — |
| 16 | Victorian Restoration: Moving the Entrance and Kitchen Layout The front door is relocated to accommodate a new larger entranceway, while the design for the kitchen is determined. Also: a tour of Isaac Royall House. |
2001-12-10 | — |
| 17 | Victorian Restoration: Electrical Systems and Wiring and Upstairs Framing Rough electrical work is in progress, framing is underway on a new addition, and a new tub and new windows are installed. |
2001-12-24 | — |
| 18 | Victorian Restoration: Roof Work and Lighting The barn's roof system gets a makeover, while the interior gets air conditioning. Shingles are added to the exterior, along with a new gutter system. |
2001-12-31 | — |
| 19 | Victorian Restoration: Skylight Installation, Roofing, and Painting A tubular skylight is installed, along with new triangular peak windows. Also, exterior painting gets underway. |
2002-01-07 | — |
| 20 | Victorian Restoration: Barn Insulation, Video Wiring, and a New Balcony Cellulose insulation is installed, and construction of the second-floor balcony begins. |
2002-01-14 | — |
| 21 | Victorian Restoration: Blue Board Installation, Landscaping, and a New Garage Door The differences between blue board and drywall are discussed, and special fencing is put in. Also: a tour of the factory where the fencing is made. |
2002-01-21 | — |
| 22 | Victorian Restoration: Work On the Driveway and Finishing the Deck Stone pavers are installed in the driveway and deck construction begins. Plaster is applied in the bedrooms, and new barn-style doors are installed in the converted dairy storage building. |
2002-01-21 | — |
| 23 | Victorian Restoration: Flooring, Glass-Block Walls and Floors, and Water Filtration An interlocking laminate floor system being installed, along with a glass-block wall in the master bath and glass-block flooring elsewhere. The water filtration system is also established. |
2002-01-28 | — |
| 24 | Victorian Restoration: Landscaping Begins, Flooring Continues, and Water Heater Installed Landscaping gets underway on the Victorian restoration project house property. |
2002-02-04 | — |
| 25 | Victorian Restoration: Cabinets, Countertops, and Closets Cabinets and countertops are installed in the kitchen. In the master bedroom, a custom closet system is designed. |
2002-02-18 | — |
| 26 | Victorian Restoration: Final House Tour The Victorian house in Medford, MA is complete, and Bob Vila guides a tour of the finished restoration, from the pergolas in the yard to the electronics in the home office. |
2002-02-25 | — |
© ACMODASI, 2010-2026
Все права защищены.
Материалы (торговые марки, видео, изображения и тексты) находящиеся на этом сайте принадлежат их правообладателям. Запрещено использовать любые материалы с этого сайта без предварительной договорённости с их владельцем.
При копировании текстовых и графических материалов (видео, изображения, тексты, скриншоты страниц) с этого сайта активная ссылка на сайт www.acmodasi.pro обязательно должна сопровождать такой материал.
Администрация сайта не несёт ответственности за любую информацию размещённую на этом сайте третьими лицами.